Skip to main content

Modeling the Alcantara Launch Center II

Some images of the final Launch Center model fully textured. Really happy with the results, specially with the vegetation, since my goal was to make a low polygon model for easy export to Orbiter simulator.

General view of the two pads: left for sounding rockets, right for the VLS and VLM
VLS-1 rocket on pad. The TMI (Mobile Integration Tower) is retracted to a safe distance.

After a successful export, here's the Alcantara Launch Center in Orbiter, with the VLS ready to launch. 

Alcantara Launch Center in Orbiter


Comments

Popular posts from this blog

Gemini B cockpit layout

The Gemini B was the military version of the Gemini spacecraft, adapted for use on the MOL (Manned Orbiting Laboratory) program. The general cockpit layout was similar, but many instruments were changed. I'm doing a 3D model of the cockpit, and as part of that I need to recreate the dashboard layout. For the normal Gemini we have great detailed instrument layouts, but for Gemini B we must work based on photos. I've identified as much labels as possible. Some probably have errors, but still I think you get the idea of the general operation. The main difference from the stock Gemini is that gauges and switches are more protected perhaps from accidental touching. Also you have controls for the MOL laboratory on the right hand panel. Left panel Center panel Bottom panel Right panel I'm working mainly based on two reference photos: (http://www.nro.gov) (unknown origin)

Space Station Freedom interior resources

Although the project was canceled and evolved into the ISS, at least some mock-ups and trainers were built. Being the late 1980's not much reference photos exist on the web. I'm posting the all the images I could find for the convenience of having them together at a single place. This way the general layout of the station can be understood. Some of the solutions found their way into the ISS, others didn't. On general the station seems bigger and the concept would make a nice virtual cockpit for a "alternate history" simulation. Mock-ups: The four long modules running left to right contain the three laboratories and the habitability area. Between these are connecting capsules, and at far right can be seen the station commander's observation cupola. The colored spheres in the foreground assembly are gas containers, with oxygen, nitrogen and other gases for experimental use. A variation of the above arrangement 1989 mock-up with American, Eu...

Hermes space shuttle interior, cockpit and instrument panel resources

The ESA Hermes space shuttle project ran from 1975 to 1992, after an original proposal from the French CNES (National Space Studies Center). The spacecraft was intended to serve two proposed  European  space stations:  the Man Tended Free-Flyer / Columbus Space Station and the Polar Platform. Before cancellation, some mock-ups and trainers were built.   Because the project was developed in the 1980's there aren't many reference photos on the web.  I'm taking the liberty of posting the all the images I could find on the web  of the Hermes interior, cockpit and instrument panels. This way they are grouped all  together in a single place for the convenience, so that the general layout can be understood and the different mock-ups / simulator versions can be sorted out.  Hermes shuttle flight simulator Hermes shuttle simulator Hermes shuttle misc mock-ups Hermes shuttle mock-up version "a" ...